
From the founder
Gavin Andrews
I built ClearBid after more than a decade in construction. Job after job, I watched the same oversights turn into change orders. They were often avoidable, and left everyone involved confused and frustrated.
A construction dispute doesn't normally start with malicious intent. It starts with a piece of paper nobody read carefully enough. A line that said "framing repair as needed." A bid that never mentioned who pulls the permit. A timeline with no room in it for the wall that turns out to be rotten.
By the time that surfaces, the money is spent and the crew is on site. The homeowner feels taken advantage of. The contractor feels punished for something they couldn't have priced. Both of them are usually right, and both of them would have caught it in ten minutes if they'd known where to look.
Give both sides of the table the same second read. Not a verdict, not a price, not a substitute for a professional — a careful pass over the document in front of you, pointing at what's missing and what's vague, before anyone signs it.
A homeowner comparing three bids shouldn't need to already know what a complete bid looks like. A contractor sending an estimate shouldn't find out what they forgot six weeks into the job. That knowledge exists — it's just unevenly distributed, and it usually arrives too late to help.











It's early. If ClearBid misses something it should have caught, or flags something that wasn't a problem, we want to hear about it — that feedback is what shapes what it checks for next. Write to us at info@useclearbid.com.